You don't have javascript enabled. Good luck with that.
Pencarian
       60 Karung Lumpur Terkumpul Dari Kali Beton
.
photo Septradi Setiawan - Beritajakarta.id

60 Sacks of Sediment Dredged from Beton River

As many as 60 sacks of sediment mixed with trash were dredged from Beton River, Tangki Urban Village, West Jakarta. It is as anticipation before rainy season, so that the Ciliwung Rivulet capacity would be increased.

While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity

"It has been dredged since yesterday," said Tangki Urban Village Head, Suhardin, Wednesday (10/28).

Water Channel Along Jalan Malaka Dredged

According to him, the rivulet has not been dredged for long time. So that it was shallowing and the capacity decreased.

"While waiting for sheet pile installation, all we can do is dredging the sediment to increase the water capacity," he uttered.

He continued, as many as 40 Infrastructures and Public Facilities Handling (PPSU) officers are deployed to the field. "Hopefully, there would be no more overflowing when rainy season," he hoped.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye559 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye454 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye310 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye302 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti